
A new office building required developing a BIM model due to the complex nature of the project.
We created 3D model of the HVAC systems and coordinated BIM model among all the trades (Architecture, Structure, Mechanical, Electrical, Plumbing, Fire Protection, etc.). Clashes among services were eradicated by re-routing utilities, changing elevation and re-sizing. We produced 2D tender drawings, rendered images and information was produced to LOD 300.
What happens after you get in touch?

No pushy sales calls just a quick, helpful chat with our UK-based team to understand your project and see if we’re the right fit.
Watch Video
A new office building required developing a BIM model due to the complex nature of the project.
We created 3D model of the HVAC systems and coordinated BIM model among all the trades (Architecture, Structure, Mechanical, Electrical, Plumbing, Fire Protection, etc.). Clashes among services were eradicated by re-routing utilities, changing elevation and re-sizing. We produced 2D tender drawings, rendered images and information was produced to LOD 300.
30,000 m2, 3 storey data center in london
Location:London - England, UK
.avif)
tIER - 3 dATa CENTER IN eNGLAND uk
Location: England, UK
.avif)
ict cENTER eNGLAND
Location:England, UK
.avif)
AS-BUILT MODELLING OF DATA CENTER
Location:Stafford, England, UK
.avif)
What happens after you get in touch?

No pushy sales calls just a quick, helpful chat with our UK-based team to understand your project and see if we’re the right fit.
Watch Video



















